    Hydro power capacity grew 37% in 2023 alone, to 1,511 MW. About 82% of Uganda’s 1,846 MW of generating capacity is hydro.

    Power plants can produce

    1,846 MW

    installed capacity, 2023

    From hydro dams

    82%

    1,511 MW

    Electricity customers

    3.6 million

    2021

    Petrol, per litre

    UGX 5,226

    average, 2023

    How much electricity Uganda can generate

    Installed capacity by source, megawatts (MW)

    • Hydro
    • Bagasse (sugar-cane waste)
    • Solar
    • Thermal (oil)

    Homes and businesses on the grid

    Electricity customers, all distributors

    2015
    2021

    Fuel: what it costs and how much we use

    Petrol’s biggest price jump came in 2022: +42%, to UGX 5,757 a litre.

    Pump prices

    Average retail price, UGX per litre

    • Petrol
    • Diesel
    • Kerosene
    2013
    2023

    Fuel sold in Uganda

    Cubic metres a year (1 m³ = 1,000 litres)

    • Petrol
    • Diesel
    • Kerosene
    • Jet fuel
    2014
    2023

    About these numbers

    Fuel prices and sales join two UBOS releases (2013–2021 and 2019–2023); where they overlap we checked that they agree before joining. Older sales figures in litres were converted to cubic metres.

    Problems we found in the source data

    • In UBOS’s 2021 table the renewable sources add up to 1,230 MW, but its renewables total says 1,247 MW. The chart shows the individual sources.